BOILER PLANT OPERATION AND MANAGEMENT

BOILER PLANT OPERATION AND MANAGEMENT  – Yogyakarta

Bali |  26 – 28 Maret 2014 | Rp. 8.500.000 
Bandung | 26 – 28 Maret 2014| Rp 7.500.000 
Yogyakarta |  26 – 28 Maret 2014 Rp.  6.500.000 
Bali |  08 – 10 April 2014 | Rp. 8.500.000 
Bandung | 08 – 10 April 2014 Rp. 7.500.000 
Yogyakarta | 08 – 10 April 2014  Rp.  6.500.000 
Bali | 14 – 16 April 2014 | Rp. 8.500.000 
Bandung | 14 – 16 April 2014 Rp. 7.500.000 
Yogyakarta | 14 – 16 April 2014 Rp. 6.500.000 

Jadwal Training 2014 Selanjutnya …

 

DESCRIPTION

The Boiler Plant Operation and Management workshop is an intensive, highly practical and useful two-day workshop. You will gain the most up-to-date information and practical understanding of the installation, operation, maintenance and management of boiler plant. This workshop will give you the ability to recognise and solve boiler problems simply, easily and with confidence. And we will learn The installation, operation, maintenance and management of boiler plant



OBJECTIVES

  1. Identify the various types of boilers
  2. Use essential terms and understand their key applications
  3. Describe the typical characteristics of fuels fired
  4. Perform basic combustion and process calculations
  5. Recognise the impact fuels have on the boiler heat transfer surfaces
  6. Describe the ancillary equipment associated with steam boiler plant and their integral role in the safety of the boiler
  7. Discuss the correct operation, control sequences and procedures for the safe operation of a typical fire-tube boiler plant
  8. Outline the applicable pressure part design codes and explain their influence on boiler pressure parts sizing, inspection and non-destructive examination
  9. Initiate an effective inspection and maintenance programme
  10. Minimise forced outages and prevent serious damage to boiler equipment
  11. Provide an overview of the legislative requirements plus the essential steps and responsibilities for the repair of boilers
  12. Recognise the importance of and implement the procedures for the protection of a boiler during cold storage
  13. Outline the technologies available for the reduction of emission levels and the applicable international legislative controls

 

OUTLINES TRAINING BOILER PLANT OPERATION AND MANAGEMENT

1.    Introduction

  • Types of package boilers and their applications
  • Boiler components, terminology and definitions

2.  Fuel Combustion And Steam Generation Process

  • Overview of the boiler heating and steam generation process
  • Influence of fuel types on boiler design and operation
  • Firing appliances
  • Basics to the theory of combustion and fundamentals of steam generation
  • Thermal efficiency
  • Fire-side deposits and their influences

3.  Boiler Auxiliary Plant

  • Water treatment and dosing plant
  • Feed water pumps, valves, steam traps,piping, fans, and dampers
  • Firingsystems
  • Economisers and heat recovery equipment
  • Flue gas cleaning and dust removal
  • Soot blowers

4.  Operations And Controls

  • Boiler instrumentation and its purpose
  • Typical P&I diagrams for coal/oil fired package units
  • OEM operating manuals
  • Control systems or loops
  • Operation and control philosophy,sequences and procedures
  • Safety equipment and emergency procedures
  • Typical operational problems, reasons for the problems
  • Troubleshooting
  • Operating records and logs
  • The do’s and don’ts of boiler operation and corrective action

5. Pressure Containing Components

  • Basics to codes calculation theory and assumptions
  • Overview of design parameters for shell,furnace, plates and tubing
  • Importance of pressure part inspection

6.  Planning And Managing Boiler Maintenance

  • Critical importance of maintenance policies and programmes
  • Manufacturers literature and requirements
  • Regularity of inspections and maintenance
  • Critical items for maintenance for safety,efficiency and reliability
  • Country/state legislation regarding inspection and repairs
  • Authorised inspection authority involvement
  • Maintenance records and preventative maintenance
  • In-house vs contractor repair maintenance
  • The do’s and don’ts in terms of boiler maintenance

7.  Managing Boiler Repairs And Modifications

  • When does a boiler repair become a boiler modification?
  • Importance of historical records
  • Understanding the steps and requirements when undertaking modifications
  • Boiler owner and contractor responsibilities
  • AIA and their inspection points
  • The do’s and don’ts regarding boiler repairs

8.  Cold Storage Of A Boiler

  • Importance of an established storage period, preservation steps and return of the boiler
  • Storage instructions and procedures
  • Consequences of no plan

9.  Emission Controls And Environmental Constraints

  • Types of emissions for different fuels fired
  • Control of boiler flue gas emission
  • Flue gas cleaning and scrubbing equipment
  • Oil and gas burner design to reduce NOx emissions
  • Effectiveness of gas cleaning or scrubbing equipment
  • Acceptable emission levels

INSTRUCTOR

Ir. Teguh Puji, MT and team

 

WHO SHOULD ATTEND?

Senior Boiler Plant Operators, Repairers & Installers, Boiler Plant Construction Managers, Plant Engineers , Operation, Maintenance, Inspection & Repair Managers, Supervisors & Engineers , Mechanical Engineers & Technicians , Design Engineers , Insurance Company Inspectors , Consulting Engineers

 

METHOD

Lecturing, workshop, interactive discussion, sharing and case study.

 

TIME & VENUE

  • 15-17 Januari / 22-24 Januari/ 28-30 Januari / 5-7 Februari / 19-21 Februari  /26-28 Februari / 11-13 Maret / 26-28 Maret /  8-10 April / 14-16 April /  23-25 April / 28-30 April / 6-8 Mei / 14-16 Mei / 26-28 Mei / 3-5 Juni /  17-19 Juni / 25-27 Juni / 2-4 Juli / 14-16 Juli / 29-31 Juli / 5-7 Agustus / 13-15 Agustus / 27-29 Agustus /3-5 September / 17-19 September / 23-25 September / 1-3 Oktober / 14-16 Oktober / 29-31 Oktober / 4-6 November / 12-14  November / 25-27 November / 2-4 Desember / 9-11 Desember / 16-18 Desember / 22-24 Desember / 29-31 Desember 2014
  • Hotel Grand Zuri – Yogyakarta

 

TRAINING FEE

  • IDR  6.500.000 per participant (Non-Residential)Minimal participants : 2 persons (Yogyakarta)
  • Bali, Ibis Styles Kuta, Ibis Legian Hotel, Hard Rock Café Hotel | Rp. 8.500.000 Per Peserta | Kuota Min. Peserta: 5 orang
  • Bandung, De Batara Hotel, Banana Inn Hotel, Golden Flower hotel | Rp. 7.500.000 Per Peserta | Kuota Min. Peserta: 5 orang

 

 

TRAINING FACILITIES

  • Quality Training Module
  • Stationeries: notebook and ballpoint
  • Flashdisk containing materials
  • Training bag or backpack
  • Morning and afternoon coffee break for at days of boiler plant training
  • Exclusive T-Shirt or Jacket
  • Certificate of Completion
  • Training photo
  • Transportation for participants from the airport/railway station to hotel/training venue.  (At least 2 persons from the same company)

 

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
  14. Captcha
 

cforms contact form by delicious:days