EFFLUENT PRODUCED WASTE WATER

EFFLUENT PRODUCED WASTE WATER
BALI / YOGYAKARTA / BANDUNG | 7 – 9 January  2014 | Rp 7.200.000,- / person
BALI / YOGYAKARTA / BANDUNG | 21 – 24 January  2014 | Rp 7.200.000,- / person
BALI / YOGYAKARTA / BANDUNG | 4 – 6  February  2014 | Rp 7.200.000,- / person
BALI / YOGYAKARTA / BANDUNG | 25 – 28  February  2014 | Rp 7.200.000,- / person
BALI / YOGYAKARTA / BANDUNG | 4 – 6  Maret  2014 | Rp 7.200.000,- / person
BALI / YOGYAKARTA / BANDUNG | 18 – 21  Maret  2014 | Rp 7.200.000,- / person

Jadwal Training 2014 Selanjutnya …

 

 

DESCRIPTION

            Produced water is the largest single fluid stream in exploration and production operations. It consists of formation water, or flood water previously injected in to the formation. Generally, produced water may be injected with minimal treatment. If the injected water contains solids large enough to plug the formation, injectivity will decline. Downhole solids contributing to plugging may include not only the solids escaping filtration, but solids generated after water treatment (eg corrosion, scale, and bacterial products). Consequently, stringent corrosion inhibition, scale inhibition and bacterial control, as well as filtration, may be required for matrix rate injection.

            The course content and approach are designed to suit participants of different background and different position in the company. It will be delivered as a to-the-point explanation by a professional instructor, utilizing an easy-to-understand examples and illustrations, especially the actual cases in Indonesia.

OUTLINE

  • Understand produced water chemistry
  • The suspended oil, dissolved oil and dissolved gases
  • Bacteriological matter and added materials
  • Suspended solid removal
  • Suspended oil removal
  • Chemical treating for control of bacteria
  • Chemical treating for the control of scale
  • Corrosion control techniques and the use of biocides
  • Corrosion and bacterial problems
  • Mineral scale formation
  • Equipment and pipeline plugging
  • Injection well and formation plugging
  • The method and operation of produced water treatment for reinjection
  • For either surface operation engineers or subsurface petroleum engineers, and anyone who involve in produced water handling, treatment, and related business activity.

COURSE  SCHEDULE

BALI / YOGYAKARTA / BANDUNG

  • 7 – 9 January  2014
  • 21 – 24 January  2014
  • 4 – 6  February  2014
  • 25 – 28  February  2014
  • 4 – 6  Maret  2014
  • 18 – 21  Maret  2014
  • 8 – 10  April  2014
  • 29 April  –  2  May  2014
  • 20 – 23  May  2014
  • 3 – 5  June  2014
  • 24 – 27  June  2014

Price :

  • Rp 7.200.000,- / person (Non Residential)
  • Rp 8.500.000,- / person (Residential)

 

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
  14. Captcha
 

cforms contact form by delicious:days