DESKRIPSI                                     

The objective of this course is to present the factors involved in operation of the gas turbine generating unit, including typical procedures for start-up and shut-down of the unit. On-load operation is discussed with particular emphasis on operating hazards and limitation. The course generally focuses on the heavy industrial type gas turbine.

MATERI

  • Objectives of operating maneuvers
  • Auto/manual operation
  • Start-up prerequisites
  • Auxiliary systems required for start-up
  • Turning gear
  • Starting device and torque convertor
  • “Break away” and speed adjustment
  • Necessity for unit purge
  • Ignition and light-off
  • Speed control to synchronization
  • Start-up curve
  • Minimum load setting
  • Change over from start-up to operating conditions
  • Permissible rate of loading
  • Base load and peak load (overload)
  • Governor control, speed droop characteristic
  • Exhaust temperature control (override)
  • Procedure for shutdown
  • Need for even cooling
  • Spin cooling; turning gear
  • Operating hazards; mechanical, thermal, combustion
  • Overspeed
  • Bearing failures
  • Vibration detectors
  • Mechanical unbalance
  • Turbine blade deposits
  • Thermal unbalance, distortion, misalignment
  • Conditions required for combustion
  • Effects of overfiring
  • Loss of ignition, explosion
  • Accumulation of unburned carbon
  • Need for complete monitoring and control system
  • Case Studies




INSTRUKTUR

Teguh Santoso ST, MT
Expert in Gas Turbin & Power Plant



WAKTU & TEMPAT

  • 13-15 Maret 2012                    : Hotel All Season – Yogyakarta
  • 17-19 April 2012                      : Hotel Scarlet Dago – Bandung
  • 11-13 September 2012           : Hotel Harris Tebet – Jakarta
  • 11-13 Desember 2012                        : Hotel Ibis – Semarang


METODE
Presentation, Discussion, Case Study, Evaluation, Post-Test & Pre-Test



FASILITAS

Certificate, Training Kit, Module / Handout, Lunch, Coffee Break, Souvenir



PESERTA

Power plant managers, supervisors, and engineers, Suppliers of Turbine – Generator components and services

INVESTASI

  • Rp. 6.500.000,- / orang (Non-Residential)
  • Rp. 5.500.000,- / orang (Non-Residential), minimum 2-3 peserta

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
 

cforms contact form by delicious:days

Popularity: 1% [?]

Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • TwitThis
  • Facebook
  • LinkedIn
  • Google Bookmarks
  • Y!GG
  • Digg
  • del.icio.us
  • StumbleUpon
  • Reddit
  • MySpace
  • Technorati
  • YahooMyWeb
  • YahooBuzz

Related training:

  1. GAS TURBINE POWER PLANT GAS TURBINE POWER PLANT Yogyakarta / Bandung |Febuary 20th -24th 2012 | 08:00-16:00 WIB | Rp 8.500,000,-/peserta Yogyakarta/ Bandung | Maret  5th -8th 2012 | 08:00-16:00 WIB | Rp 8.500,000,-/peserta Deskripsi...
  2. POWER GAS TURBINE POWER GAS TURBINE Hotel Ibis, Yogjakarta | 24-26 Januari 2012 | Rp. 5.500.000 Per Peserta Hotel Ibis, Yogjakarta | 30 Januari – 1 Februari 2012 | Rp. 5.500.000 Per Peserta...
  3. Gas Turbine: Operation & Maintenance – YOGYAKARTA Gas Turbine : Operation & Maintenance - YOGYAKARTA Hotel All Seasons, Yogyakarta | 26-28 Juni 2012 | IDR 6.000.000,- Hotel All Seasons, Yogyakarta |  17-19  Juli 2012 |  IDR 6.000.000,- Hotel...
  4. Process Plant Equipment Sizing & Selection Process Plant Equipment Sizing & Selection Yogyakarta | 16-19 April 2012 | IDR 7,000,000.00 per participant Yogyakarta | 30 July-02 August 2012 | IDR 7,000,000.00 per participant Yogyakarta | 03-06 December 2012  | IDR 7,000,000.00...
  5. OPERATION AND MAINTENANCE OF STEAM GENERATOR AND TURBINE OPERATION AND MAINTENANCE OF STEAM GENERATOR AND TURBINE Golden Flower Hotel, Bandung | 26-29 Mar 2012 | Rp 7.250.000,- PENDAHULUAN : Turbin uap merupakan salah satu jenis penggerak mula yang banyak...
  6. OPERATION, MAINTENANCE, AND THROUBLE SHOOTING OF GAS TURBINE OPERATION, MAINTENANCE, AND THROUBLE SHOOTING OF GAS TURBINE Golden Flower Hotel, Bandung | 21-24 May 2012 | Rp 7.250.000,- PENDAHULUAN : A gas turbine extracts energy from a flow of...
  7. Vertical Turbine Pump Vertical Turbine Pump Yogyakarta | 16-19 July 2012 | IDR 7,000,000.00 per participant Yogyakarta | 19-22 November 2012 | IDR 7,000,000.00 per participant DESCRIPTION This workshop will provide a good understanding of pump designs,...
  8. Power System Stability and Control Power System Stability and Control Yogyakarta | 27 February-01 March 2012 | IDR 7.000,000.00 per participant Yogyakarta | 11-14 June 2012 | IDR 7.000,000.00 per participant Yogyakarta | 05-08 November 2012 | IDR...
  9. Protection on Power Systems Protection on Power Systems Yogyakarta | 26-29 March 2012 | IDR 7.000,000.00 per participant Yogyakarta | 09-12 July 2012 | IDR 7.000,000.00 per participant Yogyakarta | 10-13 December 2012 | IDR 7.000,000.00...
  10. PERANCANGAN TATA LETAK PABRIK (PLANT LAYOUT) PERANCANGAN TATA LETAK PABRIK (PLANT LAYOUT) Golden Flower Hotel, Bandung | 17-20 September  2012 | 08:00 – 16:00 | Rp 7.250.000,-   LATAR BELAKANG : Tata letak pabrik (plant layout)...

Leave a Reply

website counter
TopOfBlogs

Switch to our mobile site

Options Theme