LIFE CYCLE COSTING (LCC)
LIFE CYCLE COSTING (LCC)
Hotel Golden Flower, Bandung | 05 – 07 March 2012 | Rp 5.500.000/person
Hotel Golden Flower, Bandung | 28 – 30 May 2012 | Rp 5.500.000/person
Hotel Golden Flower, Bandung | 25 – 28 June 2012 | Rp 5.500.000/person
Hotel Golden Flower, Bandung | 02– 04 July 2012 | Rp 5.500.000/person
Hotel Golden Flower, Bandung | 24 – 26 September 2012 | Rp 5.500.000/person
Hotel Golden Flower, Bandung | 26 – 28 November 2012 | Rp 5.500.000/person
TRAINING INTRODUCTION :
Life Cycle Costing (LCC) also called Whole Life Costing is an economic assessment of an item, system or facility, considering all the significant costs of ownership over its economic life, expressed in terms of equivalent dollars/euros. LCC is important because the visible costs of any acquisition/purchase represent only a small proportion of the total cost of ownership. Another important reason for LCC is due to a strong relationship between operation and maintenance costs and the functionality and reliability of the item. Therefore, the application of LCC requires a sufficient engineering knowledge.
LCC itself is a structured approach that addresses all elements of ownership costs in relation with the functionality and reliability performance of the item. The results of an LCC analysis, one of them is a cost profile of the product or service over its anticipated life-span, can be used to assist management in the decision-making process where some options exist. Major area of LCC applications are in hardware acquisition process, modification of hardware and software, and in reduction of operation and maintenance costs.
LCC consists of Life Cycle Cost model development and the Life Cycle Cost model application for each option. The primary activities of the Life Cycle Cost model development are the Cost Breakdown Structure (CBS) development and the selection of cost component estimation method. The output of LCC is a Life Cycle Cost estimate, including its distribution on a time scale, cost drivers, sensitivity of the estimate to particular parameters and the risk due to uncertainty of design parameters.
HOW YOU CAN BENEFIT FROM THIS TRAINING :
- To improve costs awareness. Application of LCC will improve awareness of the management and engineers on the factors that drive cost and the resources required by the item, so that cost reduction program is possible.
- Whole life costs evaluation. LCC allow evaluation of competing options on the basis of whole life costs.
- Trade-off performance against cost. When assessing options, cost is not the only factor to be considered. There are other factors such as the compliance to the specified performances and the levels of service to be provided.
- Maximize revenue. By applying LCC, the operation and maintenance costs are reduced without sacrifying the performance of the production equipment through analysis of the performance parameters and cost drivers.
- Specific for engineers, this course will describe the relationship between the functional and reliability performances and costs. This makes possible to identify specifications which resulting in high Life Cycle Cost.
- Understand the procedure to implement LCC including the development of Life Cycle Cost model for various applications.
- Understand the theoretical background of time value of money and risk analysis as well as their impact on decision making process.
WHO SHOULD ATTEND THIS TRAINING ?
- Engineers (Engineering, Reliability, Maintenance)
- Purchasing engineer/manager
- Project Engineer
- Process & Manufacturing Engineer
- Maintenance Manager/ Supervisor
- Other professional who wants to have a better understanding and take advantage from the course.
TRAINING MATERIAL OUTLINE :
- Why LCC?
- LCC and system effectiveness.
- Various economic evaluation.
- LCC procedure.
- Cost Breakdown Structure (CBS)
- Cost Estimation Methods.
- Time value of money
- Risk analysis
- Cost drivers identification
- Area of LCC applications.
- LCC model development.
- LCC for hardware acquisition.
- LCC for hardware modification.
- LCC for maintenance optimization.
- Interactive discussion
TRAINING INSTRUCTOR
Dr. Ir. Edy Suwondo is a lecturer at the Aerospace Engineering Department, Institute Technology of Bandung (ITB) and a member of the Aircraft Design, Operation and Maintenance Research Group, ITB. He has been working in the area of maintenance since 1992. His expertise is in Reliability Centered Maintenance, Reliability Control Program, Maintenance Planning and Life Cycle Costing. He has conducted various research in those area at GMF AeroAsia, Royal Dutch Airlines (KLM), Nusantara Turbine and Propulsion (PT NTP) and Indonesian Aerospace Company (IAe). He involves also in various projects in his research group. Mr. Edy Suwondo received his bachelor degree from the Aerospace Engineering ITB and his doctor degree from Aerospace Engineering, Delft University of Technology (TU Delft), The Netherlands. His doctor research was in the applications of Life Cycle Costing in maintenance area.
VENUE :
Hotel Golden Flower, Bandung
TRAINING DURATION :
3 days
TRAINING TIME :
- 05 – 07 March 2012
- 28 – 30 May 2012
- 25 – 28 June 2012
- 02– 04 July 2012
- 24 – 26 September 2012
- 26 – 28 November 2012
INVESTATION PRICE/ PERSON :
- Rp 5.500.000/person (full fare) or
- Rp 5.250.000/person (early bird, payment 1 week before training) or
- Rp 5.000.000/person (if there are 3 persons or more from the same company)
FACILITIES FOR PARTICIPANTS :
- Training Module
- Training CD Contains Training Material
- Certificate
- Stationeries: NoteBook and Ballpoint
- Jacket or Waistcoat or T-Shirt
- Bag or Backpackers
- Training Photo
- Training Room with Full AC Facilities and multimedia
- Once lunch and twice coffeebreak every day of training
- Qualified instructor
- Transportation for participants from hotel of participants to/from venue of training(if minimal number of participants from one company is 4 persons)
cforms contact form by delicious:days
Popularity: 1% [?]
Related training:
- Life Cycle Costing Life Cycle Costing Jayakarta Hotel, Bandung | May 17-20, 2010 | Rp. 7.250.000,- COURSE INTRODUCTION Life Cycle Costing (LCC) also called Whole Life Costing is an economic assessment of an...
- Life Cycle Costing – (PASTI JALAN) Life Cycle Costing Hotel Amaris Cihampelas, Bandung | 27-28 Juni 2011 | Rp 4.500.000, DESKRIPSI Life Cycle Costing (LCC) juga disebut Whole Life Costing adalah penilaian ekonomi suatu item, sistem...
- IEC 61508 & 61511 Safety Life Cycle : The new standard in safety IEC 61508 & 61511 Safety Life Cycle: The new standard in safety Hotel amaris, Bandung | 11-14 Juli 2011 | Rp. 8.000.000/person DESCRIPTION This three day course is designed...
- IEC 61508 & 61511 Safety Life Cycle: The new standard in safety IEC 61508 & 61511 Safety Life Cycle: The new standard in safety Golden Flower Hotel, BANDUNG | May 04-06, 2010 | US$ 770.00/person COURSE OBJECTIVE This thre day course...
- CULTURE CHANGE FOR MAINTENANCE AND RELIABILITY IMPROVEMENT CULTURE CHANGE FOR MAINTENANCE AND RELIABILITY IMPROVEMENT Hotel Golden Flower Bandung | 19 – 21 December 2011 | Rp 5.500.000/peserta Hotel Golden Flower Bandung | 26 – 28 March 2012...
- SERVICE RECOVERY : CREATE LOYAL CUSTOMERS FOR LIFE SERVICE RECOVERY: CREATE LOYAL CUSTOMERS FOR LIFE Hotel Golden Flower Bandung | 20 – 22 February 2012 | Rp 5.500.000/peserta Hotel Golden Flower Bandung | 14 – 16 Mei 2012...
- Industrial Ergonomics for Improving Productivity, Safety, and Quality of Working Life – (PASTI JALAN) Industrial Ergonomics for Improving Productivity, Safety, and Quality of Working Life HARRIS Sui tes FX Sudirman, Jakarta | May 1st – 2nd, 2012 | Rp. 3.250.000 ,- (Full fare) Latar...
- Gearbox Technology : Design, Analysis, Testing, Maintenance, Lubrication,and Failure – YOGYAKARTA Gearbox Technology: Design, Analysis, Testing, Maintenance, Lubrication, and Failure - YOGYAKARTA Puri Artha, Yogyakarta | 24 – 27 Januari 2012 | IDR 5.500.000,- Puri Artha, Yogyakarta | 21-24 Februari 2012 | IDR...
- PREVENTIVE & PREDICTIVE MAINTENANCE PREVENTIVE & PREDICTIVE MAINTENANCE Bandung | February 15-17, 2012 | IDR 7.250.000,-/ Person Course Introduction Current competitions on product price and product quality have introduced complex production systems, which...
- Preventive and Predictive Maintenance – YOGYAKARTA – (PASTI JALAN – RUNNING) Preventive and Predictive Maintenance - YOGYAKARTA Hotel IBIS, Yogyakarta | 29 – 31 Desember 2011 | IDR 6.000.000,- (PASTI JALAN) All Seasons, Yogyakarta | 24-26 Januari 2012 | IDR 5.000.000,- All...













