BEAM (SUCKER ROD) PUMP

BEAM (SUCKER ROD) PUMP
Hotel Papandayan, Bandung | 21 – 23 Agustus   2013 | IDR  9.750.000,- /Participant
Hotel Papandayan, Bandung | 17 – 19 Desember 2013 | IDR  9.750.000,- /Participant

 

 

SUMMARY
This course is to summarize the state of the art of sucker rod pump technology. It included the example problems to illustrate the use of various theoretical solutions, it also listed an overview of conventional well productivity and Inflow Performance Relationship (IPR) technology and is general introduction to the latest methods of  production optimization using sucker rod pump technology.
Ever since August 29, 1859, When Colonel Drake discovered oil in Titusville, Pennsylvania, man has been trying to lift oil from non-flowing wells through some artificial method. Unfortunately, regardless the method selected, we seem to do it very inefficiently most of the time.

Since the Drake discovery, the equipment available for this purpose has improved tremendously. And so has the technology to our best advantage. The truth is that we waist millions each year in the initial installation and subsequent repair and maintenance of artificial lift equipment that was the wrong type for the particular well from beginning.

Designing a sucker rod pump installation is not an exact science; it is mostly an art. But it is a talent which can be easily acquired if care and attention are paid to what the well is telling us, and what we want to do with the well. The well conditions vary from one well to other, but the basic information required for a design does not. What we require from a particular well must, of course, be within the limits of the well in question.

Sucker rod pump design provided information required for analyzing the behavior of a productivity well interval using rod pump. This thus makes it possible to answer some fundamental questions:

  1. What is the well producing capacity?
  2. What fluids do they produce?
  3. At what flow rates?
  4. What is the rod pump to use?

In this course, it  has also included example problems to illustrate the use of various theoretical solution. Wherever possible, it has not only discussed practical difficulties that one may encounter while using the theoretical solutions, but it has also listed some of the method that one can used to obtain the desired information. It also included descriptions on field histories wherever they were available and trouble shooting using sucker rod pump.

This course is mainly directed to the practicing professionals who make engineering calculations and decision on sucker rod pump application. For managers, the course helps to review the present state of the art. It also outlined some of new method in artificial technology that exist today. These gaps in technology will be useful for research engineers and research professionals to determine the areas of future research.

OUTLINE
I.    INTRODUCTION

  • The Origine of Petroleum
  • Basic Exploration
  • Basic Drilling and Completion
  • Basic Production Engineering

II.    ARTIFICIAL LIFT METHOD

  •  The Sucker Rod Pump
  • The Hydraulic Pump
  • The Submersible Pump
  • Gas Lift
  • Free Piston Lift

III.    DETERMINING THE BEST METHOD FOR THE WELL

  • Lease Considerations
  • Well and Reservoir Analysis
  • Equipment Parameters
  • Conclusion

IV.    THE SUCKER ROD PUMP LIFTING METHOD

  • Background And History
  • Sucker Rod Pumping
  • The Pumping Unit
  • The Wellhead
  • The Polished Rod
  • The Sucker Rod
  • The Sucker Rod Pump

V.    SUCKER ROD PUMP CLASSIFICATIONS

  • API Pump
  • API Pump Designations
  • Tubing Pumps
  • Traveling Barrel,Bottom Hold-Down Insert Pumps
  • Stationary Barrel,Bottom Hold-Down Insert Pumps
  • Stationary Barrel,Top Hold-Down Insert Pumps
  • Stationary Barrel,Top And Hold-down Insert Pump
  •  Special Pumps
  • The Axelson ”VOLUMAX”
  • The Axelson “SAN’PUMP”
  • The Axelson “TRIAX”
  • The Axelson ”HOLLOW TUBE”
  • The Axelson ”CIRCLE-A”
  • Pump Parts And Fittings
  • Barrel Tubes
  • Cages
  • Plungers
  • The Axelson “Ring Valve”
  • Balls and Seats
  • Other Fittings

VI.    DESIGNING THE INSTALLATION

  • Analsys Of The Well
  •  Selecting The Subsurfaces Oil Well Pump
  • Determining The Pump Bore Size
  • Choosing The Pump Type
  • Selection of Materials
  • Beam Pumping
  • The Dynamometer Card
  • Determining Favorable Pumping Speeds
  • Establishing Production Rates
  • Peak Polished Rod Loads
  • Maximum Rod Stress
  • Minimum Polished Rod Load
  • Polished Rod Load Range
  • Peak Torque
  • Polished Rod Horsepower
  • Pump And Rod Installation Design
  • Plunger Slippage And Fits
  • Designing the Sucker Rod String
  • Specific Information Required
  • Sucker Rod String Design Charts
  • The Rod String Load Ratio
  • Sucker Rod Couplings
  • Sucker Rod Coupling Displacement
  • The Inhibitor Program

VII.    INSTALLATION, OPERATING AND TROUBLE SHOOTING THE PUMP

INSTRUCTOR :
Dr.Ir. Sudjati Rachmat, DEA
DR. IR. SUDJATI RACHMAT, DEA was graduated from Petroleum Engineering Department of ITB in 1979 and hold Doctorate Degree with honored in 1987 from Ecole Centrale de Lyon I, France. The topic of his thesis is Modelisation Numerique d’Ecoulements Polyphasiques en Milieux Poreux Application au Cas de Calcul des Champs de Pressions et de Saturations dans un Gisement de Petrole.
For the time being, he became a lecturer in Petroleum Engineering Department of ITB. His subjects are Analysis and Numerical Method, Engineering Mathematics, Computer Simulation, Fluid Mechanic, Artificial Intelligence for Petroleum Engineering.
He also gave many courses to the community, such as: basic reservoir engineering and reservoir simulation, basic production engineering, down hole well testing, statistic and numerical method for petroleum engineering, basic log interpretation, etc. He is a member of some profession organization such as: IATMI, SPE/EIME, IMA, HAIAI, FPS-USA,

VANUE AND DATE
Vanue  :
Hotel Papandayan, Bandung

Date :

  • 21 – 23 Agustus   2013  ( Batch I )
  • 17 – 19 Desember 2013 ( Batch II)

INVESTATION

  • IDR  9.750.000,- /Participant Non residential.
  • Fir send 3 participant from the same company IDR. 8.250.000,-/participant.

FACILITIES

  • Training Kit
  • Soft Copy Material Training On Flashdisk 4GB.
  • Coffee Break & Lunch
  • Certifikat
  • Souvenir
  • Additional Program (optional)

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
  14. Captcha
 

cforms contact form by delicious:days